Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

All ideas

Modifying Shear Lug Location

I am designing a Column-Gusset-Base Plate Connection for a Steel Specially Concentric Braced Frame and I am wondering: Is it possible to modify the location position of the shear lug? I would like to align it with the centerline of the column like...
over 1 year ago in RAM Connection 0 Needs review

Include plan generation when adding Load Combinations with the API

Being able to create custom load combos using the API would be extremely useful if there was an option to specify which plans to generate along with each combo (stress, force, deflection, reactions, soil bearing). Having to create the plans manual...
about 2 years ago in RAM Concept 0 Planned

2 HORIZONTAL BRACING CONNECTING TO BEAM

No description provided
over 1 year ago in RAM Connection 1 Needs review

Load Case Selection Set Presets In RAM Frame

Please add selection set presets for groups of load cases in the analyze dialogue in RAM Frame. I always have at least groups of load combos for strength and groups for deflection, and sometimes have groups for modal analysis. It would be great to...
over 4 years ago in RAM Structural System 0 Needs review

Ability to cancel report printing in RAMSS

Some reports are long and take a while to load. It would be nice to have the ability to terminate the report loading/printing process.
over 4 years ago in RAM Structural System 0 Needs review

Shop Drawing for cables in Revit and AutoCAD with consider a duct height.

No description provided
almost 3 years ago in RAM Concept 0 Planned

WT stem down directly bolted to the gusset

No description provided
over 1 year ago in RAM Connection 0 Needs review

Early Age Strength Checks for Temporary Loading during Construction

It is well documented that all slabs undergo a variety of loading combinations during construction when the concrete has not yet achieved its target design strength. In the UK this is commonly during the second and third weeks, following the slab ...
over 1 year ago in RAM Concept 0 Future consideration

Option to collapse the "Demand" section of reports

When reviewing connect results reports during design, it can be obnoxious and time-consuming to scroll through the 300+ load combinations created by RAM Frame in each section of the report before you see the geometry considerations and design chec...
7 months ago in RAM Connection 1 Needs review

Align Beam top with orthonal beam in HCBB connection

In a HCBB connection if the beam sections are different by default they are aligned along center line. Provide an option to align them at top flange. Refer Feature (PBI) #1693987
7 months ago in RAM Connection 0 Needs review